Directions & Projects



1Spintronics in Low Dimensional Quantum Materials

2Novel Materials and Interface States

3Molecular Beam Epitaxy

Facilities


1MBE

Installed in April. 15th, 2016

High vacuum condition: ~ 5×10E-11 mbar;

Equipped with 7 thermal evaporation cell (Eu, Cr, Fe, La...) ;

 

2 Spectromag


Installed in November. 15th, 2015

Measurement condition:1.5K-300K, 7 Tesla, equipped with electrical-low-noise system;

Excellent optical path parallel and vertical magnetic field direction;

3Nano fabrication (Cleanroom)

Shared facilities by Inernational Center for Quantum Materials(ICQM)

4Closed Cycle

Installed in September 10th, 2016

Measurement condition: down to 4K, 1000 Gauss magnetic field, equipped with optical table.

 


Room East 404/504, Physics Building, No. 209 Chengfu Road, Haidian District, Peking University
© Copyright © Wei Han's Group - Lab for Spintronics and Emergent Materials, All rights reserved.